Home > Company Projects > Important Projects > Sanitary Drainage Works
Development of Sanitary Drainage Utility at Shebeen El-Koum - Menoufeya Governorate
Spiral pumping station,Final sedimentation tanks & Filters tanks
Primary sedimentation tanks
Filters tanks
Inlet- screens – grit removal
Spiral pumping station
Grit removal
Grit removal
First Stage of Sanitary Drainage at Shebeen El-Koum
Purification Plant

Owner

:

National Organization for Potable Water & Sanitary Drainage

Contract Date

:

  First Stage :1984
  Expansions :2001
  Additional work :2009

Value of Contract

:

382 millions L.E.

Description

:

The project includes the design and implementation needed to develop and strengthen the Sanitary Drainage Utilities at Shebeen El-Koum City till year (2030). The area of the project (14.5) fed. including the former station.


• STAGE I:
- PURIFICATION PLANT: with discharge 60 thousand m3/day .
- (12) PUMPING STATIONS: 5 main stations +7 sub-stations with capacity ranging from 6500 to 20000 m3 / day.
- GRAVITY NETWORKS: Clay pipes of diameters ( 7" : 40" ) & length  ( 114.32 Km ) .
- FORCE MAIN: Ductile cast iron pipes of diameters (300: 800 mm) & length ( 32.86 Km ).
- CROSSINGS: (2)Tunnel crossings below the railway, diameter (2250 mm).

       
• STAGE II:
 - EXPANSIONS OF PURIFICATION PLANT: to raise the energy by 30 thousand m3 / day to reach 90 thousand m3 / day.
- (9) PUMPING STATIONS: (4) main stations + (5) sub-stations.
- GRAVITY NETWORKS:
    - Clay pipes of diameters ( 7" : 24" ) & length  ( 44.5 Km ) 
    - Plastic pipes of diameters (6:28 ") & length ( 37 km)
- FORCE MAIN:
    - Polyethylene pipes diameters (200 : 400 mm ) & length of 22 km.
    - U.P.V.C pipes of diameter (400 mm) & length (17.2 km) 
- CROSSINGS:
    - (3) Tunnel crossings below the railway, diameters (2250, 1800,       800 mm).
    - (1) Tunnel crossing below Shebeen Sea, diameter (1800 mm)

• ADDITIONAL WORK : REPLACEMENT AND RENEWAL FORCE MAIN at two pumping stations 1&4.

                                                                                                                           
                                                                                                                                                         
 
Skip Navigation Links
General Statments
Financial Data
Company Activities
Company Projects
Quality Certificates
Real Estate Investment
Equipment
Contact us
Important Links
AugustSeptemberOctober
SunMonTueWedThuFriSat
1234567
891011121314
15161718192021
22232425262728
2930
 
◄ SEWAGE PURIFICATION PLANTS :-

• Excution of Networks Force Main and Pumping Station For Om Saber Village and its Followers Monshate Nasser Village - Behaire Governorate .

• Sewage Treatment Plant For EL Koum EL Ahmar Village Shebeen EL Kanater Post Qalyoubia Governorate .

• Supplementary Works To Transfer Sewage Water From Pumping Station NO.3 To EL Shorouk City Treatment Plant Capacity :60 Thousand M3/Day

• Expansions Works for Sanitary Drainge Pumping Station C at New Borg El Arab City

• Sanitry Drainage for Shabraweesh Cluster Age Post Dakahlia Governorate

• Supply and Installation of Main Drainage Lines for the First Phase of Mostakbal City Project .

◄ DRINKING WATER PURIFICATION PLANTS ;-

• Ground Tank and Potable Water Pumping Station For ( Berake El Khaiyam - Ezbet El Essaily ) Villages -Guiza Governorate .

• Execution of PUMPS Room In Baheeg Pumping Station To Feed 6th Districts With Water - New Borg El Arab City .

• Elevated Water Tanks To Feed Monshaet El Kanater City and Giza Governorate

• Networks Works For West of Nile Potable Water Plant - Kena Governorate .

◄ UTILITIES WORKS ;-

• Execution of (Potablewater - Sanitary Drainage - Irrigation ) Networks For (735 Feddane Zone ) At The Southern Expansions and Sub-Base For Services Area At New Souhage City .

• Execution of Utilities (Potablewater - Sanitary Drainage - Irrigation -Sub-Base For Roads ) For The Third and Fourth Residential District at New Qena City .

• Internal Infrastructure Works ( Road - Potablewater - Sanitary Drainage - Electricity ) For The Second Phase of The Leather City at El Robaiky .

• Infrastructure Works (Potablewater - Sanitary Drainage - Irrigation - Electricity - Communications - Civil Works ) For The First Priority Zone At New Administrative Capital .

• Utilities Works ( Roads - Potablewater - Electricity - Sanitary Drainage - ) For The Residential City In Front Of El-Rehab City At Cairo - Suez Road .

◄ ROADS :-

• The Second Stage of Roads in Some Areas of Build Your House Project (No. 1,2) in New Beni Swef City

◄ EDUCATIONAL BUILDINGS ;-

• Faculty of Tourism and Hotels at Menoufeya University - Sadat City

• Faculty of Veterinary Medicine - Sadat City - Menoufeya University

◄ MARINE WORKS :-

• El Obayed Shore Protection

• Construction Of A Third Beam For The Quay Wall Cranes - Dekheila Port Constainers Terminal .

• Construction Of A Quay Wall NO. 85-3 At Alexandria Port

• Second Stage Works For Abu Qir Marine Port Development Rroject .

© All rights reserved to Egyco
Design And Development By  MH Sites